Replacing hardwood floors typically takes longer than refinishing hardwood floors. The removal of existing hardwood floors can require the leveling of floor joists and the replacement of subfloors as well. After, installing the new floors, belt sanding, staining, sealing, and applying a finish coat takes approximately 10 days depending on the square footage of your property. It would be safest for the owner to not reside in their property for around 2 weeks, while this work is being performed.


Close Free Consultation Free Consultation